
TRANS ADRIATIC PIPELINE
Consolidation of pipeline embankments in the Albanian section.
The route of the Trans Adriatic Pipeline (TAP), intended to increase energy supplies, will be 878 kilometres long and start at the border between Greece and Turkey, where it will connect to the Trans Anatolian Pipeline (TANAP). It will then continue on dry land, crossing Northern Greece in its longest stretch, stretching westwards through Albania until it reaches the Adriatic coast. The route through Albania includes 215 kilometres on land and 37 kilometres offshore within Albanian territorial waters. In the summer of 2015, work began to renovate roads and bridges along the TAP route. Among other interventions, the pipeline embankments were strengthened by spraying on a specific cement mixture formulated in DRACO laboratories.
Products used




