CLOSE

    Send us a message

    Fill out the form below to get in touch with our experts right away

    I have read and accept the terms of the Privacy Policy *

    CLOSE

    Call us now

    Contact our company
    to explain your project to us.

    Our offices are open from Monday to Friday
    from 9.00 to 18.00 (GMT +1)

    +39 02 90632917

    TRANS ADRIATIC PIPELINE

    Consolidation of pipeline embankments in the Albanian section.

    PLACE:

    TRANS ADRIATIC PIPELINE | Albania

    CLIENT:

    TRANS ADRIATIC PIPELINE (TAP)

    AGENCY:

    GARDEN LINE

    TYPE OF SURGERY:

    Shotcrete for consolidating pipeline embankments.

    GALLERIA FOTOGRAFICA:

    The route of the Trans Adriatic Pipeline (TAP), intended to increase energy supplies, will be 878 kilometres long and start at the border between Greece and Turkey, where it will connect to the Trans Anatolian Pipeline (TANAP). It will then continue on dry land, crossing Northern Greece in its longest stretch, stretching westwards through Albania until it reaches the Adriatic coast. The route through Albania includes 215 kilometres on land and 37 kilometres offshore within Albanian territorial waters. In the summer of 2015, work began to renovate roads and bridges along the TAP route. Among other interventions, the pipeline embankments were strengthened by spraying on a specific cement mixture formulated in DRACO laboratories.